Case study · Signal Estimator for Viya · In build

A 37-tab house estimate, reconciled to the paisa. Then locked as a budget for every stage and work item.

Like most home builders, Viya Constructions prices each house in an Excel workbook copied from the last similar job. Signal Estimator is the live estimating app built around that work. On top of it we are building Viya Estimator, which turns an approved estimate into the budget that purchase requests, purchase orders and work orders are checked against. The budget step is proven end to end on one real estimate. The checks are designed, not yet built.

Client
Viya Constructions
Offering
Platform · Signal Estimator
Industry
Design-and-build home construction
Feeds
ProjectSignal site budgets and Bleno budget lookups. Both designed, not yet built
Status
Estimating app live. Budgets from estimates in build.

[01]Where it standsViya Constructions

The estimating app is live. The budget built on it is proven end to end on one real estimate.

As of 5 November 2026, the date of the last build record. Nothing here is a forecast.

  • 37
    tabs in the one real estimate we traced cell by cell
  • 20
    errors and inconsistencies found in it, each listed with its cell and effect. Ten change a total
  • 9 of 13
    phases of the Viya Estimator build done, each closed by a report a person checks
  • 31 of 31
    checks passed taking that estimate from upload to a locked budget
PartStatusWhat that means
Signal Estimator: rate analysis, quantity sheet, pricing, client estimate, budget, material listLiveDeployed since 1 September 2026.
Drawing takeoffDWG validated. PDF in validationDWG (AutoCAD) reading is validated on one real residential sheet set. PDF reading is built and being validated.
Steel calculatorWorking for 7 of 13 member typesColumn, beam, lintel, slab, isolated footing, strip footing and pile.
Viya Estimator: import, reconciliation, flags, budget versions, approvalBuilt, proven on one estimateRuns on the build system.
Budget totals into ProjectSignal. Bleno reading budgets directlyDesigned, not builtThe design is written. Nothing was built as of 5 November 2026.
Budget checks on purchase requests, purchase orders and work ordersDesigned, not builtIn the later phases of the plan, which end in a pilot on one live site.

On 5 November 2026 one full estimate went from upload to an approved, locked budget that reconciles to the workbook's total to the paisa (a hundredth of a rupee), then to a first revision carrying one named correction.

No quantity, rate or amount in either product comes from an AI model.

Who did what

WhoWhat, and when
TGH Tech builtThe rebar schedule tool for 13 kinds of RCC member (July 2026). The October release of Signal Estimator: drawing takeoff, guided steps, pricing warnings (15 to 21 October 2026). Viya Estimator, in build from 3 November 2026.
TGH Tech reviewed, traced and plannedA written review of the estimator, the 37-tab trace, the estimate-to-site plan and the 13-phase build plan (October to early November 2026).
Viya's ownThe estimating method: workbook, rate analysis, descriptions of work. The decision of 1 November 2026. Every approval of rates, flags and budgets.

[02]Where it startedViya Constructions

One workbook, copied from the last job, sets the price. And the margin, the material and the labor.

Viya's estimator copies the workbook from the nearest earlier job, measures the new drawings into it, updates prices and reads the result off the summary.

  1. 01

    Copied workbooks carry old tabs

    Tabs from earlier jobs stay in the file, some still linked, and only the estimator knows which.

  2. 02

    One file, four audiences

    Sales needs a clean price, management the margin, purchase the quantities, planning the labor by stage. All open the same file.

  3. 03

    Errors hide in formulas

    A broken reference or a sum over the wrong range still gives a plausible number. Nobody checks hundreds of lines before a client meeting.

  4. 04

    The estimate never reaches the site

    It is the most detailed plan the company makes for a building, and nothing in execution reads it. A request for blocks arrives as a chat message with no budget beside it.

Before

Three files that drift apart.

  • Each estimator keeps a private rate sheet
  • Quantities retyped for every floor
  • A missing rate is a blank cell
  • Quote, budget and material list typed separately
As designed

One set of lines, every output.

  • One company rate analysis, with overrides per project
  • A typical floor measured once, then cloned
  • An unpriced line raises a warning and relabels the total
  • Quote, budget and material list recomputed from the same lines

[03]How we learned the workViya Constructions

We followed one real estimate from the price of cement to the final price. Every figure, back to its source cell.

Before building budgets from estimates, we had to know exactly how Viya's estimate is made, and which numbers can be trusted.

Link in the chainWhat it holdsWhat a budget needs from it
Material pricesWhat the company pays per bag, cft (cubic foot), kg or block. Two cement grades, two prices.A cement order is checked against its own grade.
Rate analysisThe recipe for one unit of work: cement, sand and aggregate per m³ of concrete, and a labor rate.Wastage sits beside the recipe, unpriced. Checks need a rule: net or with wastage.
QuantitiesCount × length × breadth × height, less openings. Steel as kg per m³ of concrete.Steel is bought by bar diameter. A total in kg cannot check a request for 12 mm bars.
Cost per lineQuantity × rate, with a material row and a labor row per item.The split already exists for civil work. Keep it, do not guess it.
TradesLines roll up by trade: foundation, RCC (reinforced cement concrete), block work, plaster.A budget per stage needs an agreed mapping.
AllowancesA top-up to the per sq ft rate civil labor is contracted at, plus overhead heads, added on the summary.A budget built only from lines would be short.
Margin and priceCost divided by one factor gives the price.Any pair of cost and price reveals the margin. Hiding a column is not enough.

Method only. No rate, price or margin from Viya's estimate appears here.

  • 10
    tabs that feed the price
  • 4
    breakdown tabs that had fallen out of date for this house
  • 23
    option, template, scratch and note tabs, mostly from earlier jobs
  • ₹2
    tolerance per total for reproducing the workbook's cost and price
  1. 01

    The tidiest tab is not always the true one

    Budgets must come from the lines that feed the price, not the breakdown tabs that look cleanest.

  2. 02

    Margin methods differ

    The workbook divides cost by a factor. The software adds a markup. They agree only if the setting is stored precisely, so margin is held to nine decimals.

  3. 03

    A whole-house total checks nothing

    Checked against cement for the whole house, a site request nearly always passes. The budget keeps quantities per item and per floor.

  4. 04

    Policy hides inside formulas

    A labor uplift for upper floors, cubic feet per truckload, wastage on tiles. Each was typed inside a formula. Each becomes a named rate or setting.

[04]What the estimator doesViya Constructions

One price book, one quantity sheet, one button to price. Every output comes from the same lines.

Signal Estimator answers a builder's three questions in order: how much work, what each unit costs, what to charge. The first version set the price book, the quantity sheet and the outputs. Our October 2026 release rebuilt the drawing reader, added guided steps and made pricing say where a quote is incomplete.

One rate analysis for the whole company.

Material prices, labor rates per unit of work, material build-ups and per sq ft labor rates live in one library. A build-up records what one unit of work consumes. The price records what it costs today. Change the price of cement once and every build-up follows.

  • Any project can override a rate without touching the company master
  • Build-up totals are never stored. They are worked out from current prices on every read
Rate analysis · RCC, one m³
Cement8 bags × 400 = 3,200Material
Sand15 cft × 60 = 900Material
20 mm aggregate30 cft × 50 = 1,500Material
Material rate5,600 per m³Computed
ReinforcementMeasured separately, per kgOwn line
Illustrative. Made-up prices and quantities.

Three ways to measure, one sheet.

Every item of work is a line: structure, category, subcategory, scope, element, specification, unit, then count × length × breadth × height. A blank dimension drops out, so counts, running meters, areas and volumes share one sheet. Lines come from typing, a cloned floor, the architect's drawing or the steel calculator.

  • Drawing quantities arrive as drafts. Nothing reaches the sheet until an estimator confirms it
  • Quantities written on the drawing, such as beam running meters or brick counts per floor, are read as evidence
Drawing takeoff · drafts to review
Note: beam running meter 48 mMatched to beam lines on the same planReview
Note: roof slab area 82 m²Three closest outlines offeredPick one
Ground floor brick totalRead from drawing text, not measuredText
External wall, net of openingsNo compatible rate in the libraryAdd rate
Illustrative. Made-up notes and quantities.

Reinforcement from the bar layout, not a rule of thumb.

Steel is often the largest single material cost in an RCC house and the hardest to measure by hand. The calculator builds a bar bending schedule for one member: cover, hooks, bends, laps on 12 m stock bars, wastage and binding wire. The total enters the estimate as one line in kg.

  • IS 456 and IS 2502 practice: lap of 50 bar diameters, hook of 8
  • The logic comes from the rebar schedule tool we built for Viya
Bar schedule · beam 230 × 450, span 4.5 m
Top bars2 nos × 12 mm, 0.889 kg per m
Bottom bars3 nos × 16 mm, 1.580 kg per m
Stirrups8 mm at 150 mm, 31 nos
Into the estimateOne line, in kgImported
Illustrative. Bar weight is diameter squared ÷ 162 kg per meter.

Pricing that says where the quote is incomplete.

Each quantity line is matched to the rate analysis. Category and unit must match exactly, so a cubic meter of concrete is never priced off a square meter rate. Subcategory, scope and specification pick the closest rate. If nothing fits, the line stays unpriced and says so.

  • A stated scope that differs rejects the rate. A roof slab is not quietly priced at a superstructure rate
  • While a warning is open, the client total reads 'Priced subtotal (review warnings)'
Fix before sending · Site A
Grade beam, plinthNo rate for this scopeUnpriced
Internal plasterLabor rate only. Does it cover material?Check
Plumbing labor, per sq ftNo built-up area enteredNot charged
Illustrative. Made-up site and lines.
  1. Out

    Client estimate

    A BOQ (bill of quantities) with margin inside the rates. Cost and margin never appear.

  2. Out

    Internal budget

    Labor and material by trade, with and without margin.

  3. Out

    Material list

    What to buy, in bags, cft, kg and numbers.

  4. Out

    Cost per sq ft

    Cost, quote and margin, by trade and by structure.

[05]From estimate to budgetViya Constructions

Viya chose not to build a better estimating screen. It chose to turn each estimate into the budget its sites are held to.

On 1 November 2026 Viya decided that estimating itself can be done in any tool, and stopped investing in the estimating screens. What it wanted built is the analysis that reads an estimate and derives the budget: Viya Estimator. We are building it on top of the existing estimator. The steps below are built and proven end to end on one real estimate, not yet on a live site.

  1. 01Estimator uploads

    Upload against the site

    The workbook is uploaded under a short alias into a project carrying the site code ProjectSignal uses, which ties the budget to the site. The file name is never kept.

  2. 02Fixed logic

    Read every line

    Description, quantity, unit, rate, amount. The reader finds the bill, the summary and the rate analysis by what each sheet holds, not its name. A person confirms a new layout once.

  3. 03Fixed logic

    Reconcile to the workbook's own totals

    Step by step, with the difference shown. Within ₹2 per total it passes. A larger difference is named, never hidden, and must be acknowledged before the import is confirmed.

  4. 04Fixed logic

    Apply the estimate's own pricing policy

    Margin, overheads and the civil labor allowance are applied as settings, so the app reproduces the estimate's cost and price.

  5. 05Estimator confirms

    Map to stage and work item

    Mapping rules place each line. Leftovers come with up to three suggestions. A person accepts one, picks another or proposes a new item.

  6. 06Senior QS clears

    Clear the flags

    On the sample: lines with a zero or missing rate, a quantity × rate that did not equal its amount, a material row labeled as labor. Each flag names the role that may clear it, often the senior QS. Every clear needs a note.

  7. 07Estimation head approves

    Approve and lock

    Approval is refused while a blocking flag is open. The first version, R0, is then locked as the estimate budget, and an execution budget is created as the copy the site works to.

Five rules behind the build plan

RuleWhat it means
Nothing hard-codedEvery rate, margin and allowance is a setting with a scope, an owner and a history: who changed it, when, before and after.
Prove it firstReproduce a real estimate's cost and price within ₹2 before building any budget feature.
Two budgetsThe estimate budget is locked once approved. The execution budget changes only with approval and a reason.
Margin is for managementRates and margin are removed on the server for roles that may not see them. The site copy has no rupee column.
Errors are named, not silently fixedR0 equals the estimate as priced, mistakes included. A correction enters a later revision as a named change the estimation head approves.
Budget R0 · Site A · review before approval
Superstructure · RCC, first floorEquals the estimateReconciled
Superstructure · SteelIn the concrete rate and again as its own lineBlocking
External works · ElevationOne rate, no material and labor splitAssumed
Superstructure · SteelNo bar sizes in this estimateNot blocking
Illustrative. Made-up site and lines.

[06]How it was builtViya Constructions

A steel tool, an estimator, a trace, then a plan built one phase at a time.

  1. 01TGH Tech

    July 2026: the rebar schedule tool

    Bar bending schedules for 13 kinds of RCC member, exported to Excel and PDF.

  2. 02TGH Tech, from Viya's method

    August to September 2026: the first estimator

    Rate analysis, quantity sheet, pricing, budget, material list, with the steel logic carried in. Live from 1 September.

  3. 03TGH Tech

    15 to 21 October 2026: the October release

    Drawing takeoff rebuilt around what estimators actually receive: native DWG files, sheet sets at mixed scales, quantities written on the drawing.

  4. 04TGH Tech

    Late October 2026: review and plan

    A written review of the estimator, then a plan tracing each of Viya's 22 request points to a proposal.

  5. 05Viya decides

    1 November: the decision

    Viya chose to build the step from estimate to budget, and named eight workflows it wants first.

  6. 06TGH Tech

    The trace, before the build plan

    One real 37-tab estimate followed cell by cell, written up so the estimation head can check every figure in Excel.

  7. 07TGH Tech

    3 to 5 November: nine phases

    Viya Estimator built on the existing estimator, keeping its price list, rate recipes and margin settings. Each phase stops for a person to check it. Four phases remain.

[07]Connected to ProjectSignalViya Constructions

A budget line that every request, order and payment can point to. Designed. Not built yet, and not live.

Viya's own design rule: the estimate work item is the spine linking scope, budget, schedule, work orders, purchases, progress and billing. About 25 requested or planned workflows read the same budget.

Underneath today. ProjectSignal holds three budget figures per site: total, labor and material. Purchase requests typed in a site group become numbered requests tracked to delivery. Bleno produces Malayalam work orders from a photographed quotation. None of these reads a budget per stage yet.

What the build adds, by design. Every budget line gets a fixed id. The estimator holds the budgets. ProjectSignal keeps the requests and orders, and asks for a check when one is raised. Bleno gets read-only budget lookups: each answer cites the site, the budget version and the source, and a site role sees quantities only.

How the write is controlled. Only site totals go to ProjectSignal, in whole rupees, from an approved version. Only an admin or management may send them, after a dry run showing the figures before and after. ProjectSignal's own validation stays the boundary.

  1. Reads

    From ProjectSignal

    • The site, by its site code
    • A request or order: stage, material, quantity, rate
    • What is already requested and ordered on that stage
    • A work order: type, quantity or area, rate
  2. Does

    The check against the locked budget

    • Returns budget, balance and percent used
    • Says within budget, over, or not budgeted
    • Compares a work order with the labor budget for that work
    • Leaves out rates and margin by role
  3. Writes

    To ProjectSignal

    • Site budget totals from an approved version
    • The answer to each check. Requests and orders stay in ProjectSignal

The design, not yet built. The push is off by default and every send is logged.

  1. Estimate workbook
  2. Locked budget
  3. Purchase requests
  4. Purchase orders
  5. Work orders

[08]More detailViya Constructions

Rate analysis and pricing

What the price book holds, and the rules that price a line.

Part of the libraryWhat it holdsWhy it is kept apart
Material pricesPrice per purchase unit: bag, cft, kg, blockA price changes. The recipe does not.
Labor rates per unitLabor per m³, m², kg or number, with the description the client readsLabor is contracted per unit. Material is bought from suppliers.
Material build-upsWhat one unit of work consumes. The total is the material rateOne build-up gives both the price and the material list.
Per sq ft labor ratesA trade's labor per sq ft of built-up areaHow electrical and plumbing labor is usually subcontracted.
Company defaultsStarting margin, trades in scope, unitsFrom CPWD (India's central public works department) rate analysis practice and IS 1200 units of measurement.
RuleWhat it does
MatchingCategory and unit must match. Subcategory, scope and specification score 4, 2 and 1. A stated value that differs rejects the rate.
General ratesA blank field on a rate row matches anything, so one general row can price lines with no specific rate.
MoneyLine amounts in exact decimals, rounded half up: money to 2 places, quantities to 3.
Editing a quantityThe estimate line follows at once. It is re-priced only if its category, subcategory, scope, specification or unit changed.
Measuring

Sheet, drawings and steel. Each with the rule that protects the quote.

SourceWhat it doesThe rule
Quantity sheetCount × length × breadth × height in meters, by structureThe unit fills in from IS 1200 defaults and never overwrites a typed unit.
DWG drawingsRead on the estimator's own server. A block counts as one objectA person confirms the units. No outside conversion service sees the drawing.
PDF drawingsVector PDFs, page by page, each with its own scaleNot yet validated on a real drawing. Scans are traced by hand.
Notes on the drawingBeam running meters, slab areas, brick counts, room sizes, plinth areasText is evidence, never geometry. The server reads the value. Nobody types it in.
ImportDraft lines with warnings to acknowledgeOne extraction imports once. A double click cannot double the concrete.
Steel calculatorSeven member types, bar by barCovers of 50, 40, 40 and 25 mm for footing, column, beam and slab.
Outputs

What comes out, and who acts on it.

OutputWhat is in itWho acts on it
Client estimate (screen, Excel, PDF)Unit, quantity, rate with margin, amount. Built separately, so cost cannot leak through a hidden columnThe client, through sales
Internal budget and material list (screen)Labor and material at cost and with margin. Materials in purchase unitsManagement, purchase
Cost per sq ft (screen)Cost, quote and margin by trade and by structureSales, management
Budget version (Viya Estimator)Lines by stage and work item. Material as net, wastage and gross. Labor by type of work. ReconciliationEstimation head, planning, purchase
Two workbooks per versionA management copy with rates and margin. A site copy with quantities onlyManagement. Site teams

A management workbook is kept to 500 rows per tab so a Bleno chat can read it from an upload. Ten standard budget questions are ready to test that. The test had not been run as of 5 November 2026.

Budget rules

What Viya Estimator refuses, flags and records.

Built, and proven end to end on one real estimate.

RuleWhat it does
Import onceThe same file read twice gives the same result. A second confirm of one import is refused.
ReconciliationEach step shows its difference. Within ₹2 per total it passes. Per-line rounding is its own row.
Blocking flagsApproval is refused while one is open: a zero or missing rate, a quantity × rate that does not equal its amount, a line with no work item, an amount outside every total. The catalog also names steel counted twice: in the concrete rate and again as its own line.
Assumed splitA line with one rate and no material and labor split is marked assumed. Above 15% of cost, the estimation head must acknowledge it. Quoted lump-sum trades kept whole as subcontract, such as elevation or water tanks, do not count.
Unmapped shareCost without a work item: under 5% before review, none after.
Named changeA correction to one line's quantity, with a name, the evidence and a reason. The estimation head approves it, and it is applied in the next revision (R1, R2).
Compare versionsShows the changed line, its stage, any overhead row that moved, and nothing else.
HistoryEvery change to a setting, rate, quantity, flag or approval writes one row: who, what, before, after, why and when.
LockedAn approved version cannot change, and keeps a copy of every setting it used.
Stages13 build stages in six groups: substructure, superstructure, finishes, MEP (electrical and plumbing), external works and general.
Roles

What each role sees and can do.

Default roles in Viya Estimator. An admin can change them.

RoleSeesCan do
ManagementEverything, including marginApprove budgets. Edit margins and allowances
Estimation headEverything, including marginImport, approve budgets and named changes, edit settings
Senior QSRates and costs. No marginImport, edit quantities, clear flags, edit the rate library, accept proposed work items
EstimatorRates and costs. No marginImport, edit quantities, clear flags, propose work items and named changes
Planning, purchaseRates and costsEdit their own library lists
Site and viewerQuantities onlyRead. Download the site copy
Who decides what

Fixed logic reads and calculates. People approve. No number comes from an AI model.

StepDone by
Reading an estimate workbook or a drawingFixed logic. No AI and no OCR. The same file gives the same result
Every quantity, rate, amount and totalFixed logic. Budget amounts are held as exact decimals
Suggesting a work item for an unmapped lineMapping rules, with up to three scored suggestions. No AI model is connected today. If one is added it may only suggest, and a person confirms
Rates, margins, allowances, stage listsSettings owned by named roles, with every change recorded
Clearing a flagThe role named on the flag, with a note
Approving a budget or a named changeThe estimation head or management
PDF and scanned estimates (planned, final phase)A reader proposes draft lines. A person confirms every value

In the Bleno workflows the AI reads, fixed logic calculates and a person confirms. An estimate workbook is structured enough that the reading is fixed logic too.

What it means for you

Four readers, four answers.

  1. For owners

    Margin stays with management

    The estimate stops being a document that is read once and filed. It becomes the budget purchases and work orders are checked against. At Viya the checks are not built yet.

  2. For estimation heads

    Your workbook, reproduced first

    Estimators keep the file they know. The app reproduces it, lists what looks wrong, and waits for you to approve each correction.

  3. For purchase and planning

    Quantities without the workbook

    Material per stage and labor by type of work. Planning and purchase see rates and costs, never margin. Site roles see quantities only.

  4. For your technical person

    Exact money, settings with history

    Exact decimals, never floating point. Every business number is a setting with history. A real workbook is the acceptance test.

Is this your company too

Five signs, and what we would need from you to start.

  • Each new estimate starts as a copy of the last similar job
  • One workbook sets the price, the margin, the purchase quantities and the labor budget
  • Only the estimator knows which tabs still feed the price
  • Material overspend is found at the end of a stage, when the bills are added up
  • Anyone who can open the estimate can work out your margin
What we needWhy
One real estimate as made today, with its rate analysis and material ratesReal files show the exceptions that samples hide
One owner: the person who approves estimatesEvery flag and correction needs someone who can decide
A rule for who may see quantities, rates and marginViews by role are set before the first budget is shared
Thirty minutes a weekTo review what the flags show

Could you rebuild the final price of your last estimate from its own lines?

Send us one real estimate workbook. We will trace it end to end, show you which tabs feed the price, and set out what a budget per stage would look like.